In continuous molding, hot spots can occur in sprues. If left unattended, sprue solidification can slow, which can lengthen production cycles and cause stringiness.
In the cooling process, the cooling circuit opens to supply cooling water to a purpose-specific bush and cool the sprue. This process quickens sprue solidification.
The hot circuit is opened to heat the sprues quickly and make production ready for the next injection cycle.